Scope of Work

Mechanical and Electrical Design and Construct to Australian Standards and BCA 2016.

Solution

Electrical

  • Installation and connection of Sub mains for 5 x Sub boards. Main Switchboard was supplied by Blacktown Council
  • Included in this site installation was Gymnasium 288m², Office space 648m², Lecture and Change rooms 180m², Medical, Ice bath and change room facilities 252m².
  • Relocation of the office building, rewire and upgrade of electrical to meet current wiring rules.
  • Aqualuma did an amazing lighting design for the gymnasium and outer deck area.
  • SAL Track Lighting was used in the shop area
  • Emergency and Exit lighting to AS2293
  • External Floodlighting, walkway deck lighting operating via timeclocks and PE cell.
  • Reportable smoke detection system was installed
  • Wifi access points
  • Pre conduiting for Comms
  • Pre conduiting for security system
  • Lockable metal Switchboards complete with Safety switches and Emergency test station.
  • Maximum Demand Calculations for council submission.

Mechanical

  • Throughout the offices Mitsubishi Electric Units were installed via High wall split systems.
  • Mitsubishi Electric  VRV system was installed with multiple ducted systems conditioning the space in the Gymnasium with an In Ceiling cassette located in the Gymnasium office space.
  • Fresh air was controlled via automatic Louvres in the gymnasium interlinked with the Air Conditioning system.
  • Fire trip shutdown for all systems over 1000l/s
  • Our Mechanical Consultant Adam Smith from Barry Smith and Associates Mechanical Consultants gave us great support throughout this project to deliver an exceptional design with a fantastic result.